Action Plan for Improving the Frequency of Water Supply in ULBs on : Tue Feb 21 15:20:38 IST 2017
District S.No Municipality Present Frequency of Supply Proposed Improvement in Frequency of Supply Amount Required for Total State Finance Grants / General Funds Available to Meet Action Plan ASC Grants Pending at ULB if any Balance Amount (26 - (27+28)) Long Term Measures (DPRs,etc) Remarks
Drilling of New Bore Wells Flushing & Deepening of Existing Bore Wells Hiring of Private Bore Wells / Wells Bore Well Materials / Others New Pump Sets / Motors Procurement of new Sluice Valves Procurement of CID Joints Improvement of Existing Source / Identification of Source for Transportation of Water Hiring of Additional Tankers and Increasing of Tanker Trips Extension of Pipe Lines
Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Nos. Amount (Rs.in Lakhs) Length (in meters) Amount (Rs.in Lakhs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Anantapur 1   Ananthapur M.Corp Once In a Day Once In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2   Dharmavaram Once In a Day Twice In a Day 22 15 5 2 0 0 24 12 24 9 60 16 115 1 2 25 1450 3 1250 13 96 0 0 96 2300 0
3   Gooty Once In Two Days Once In a Day 20 30 50 5 0 0 30 2 30 20 20 5 200 5 5 6 0 0 2500 100 173 0 0 173 10583 1. The distribution lines will be laid in Jangala Colony ,Sundaraiah Colony in 8th ,17th and 18th wards from Rs.10 .00 Lakhs. 2. The source at YT cheruvu will be increased by supplying UG Cable and panel boards (4 nos) for Rs.4.00 lakhs. 3. Sri Sathya sai pumping main will be connected with GLSR s in Paimalavada Kota Area and Kummari veedhi for Rs.79.00 Lakhs 4. Interconnections of distribution lines and pipe line materials in distribution network for Rs.20.00 Lakhs. 5. ASC Grants for 56.30 Lakhs submitted.
4   Guntakal Once In a Day Once In a Day 15 10 30 4 0 0 100 5 20 10 20 15 0 0 1 10 22000 28 5250 157 239 0 33 206 0 Transportation of drinking water with hire tankers and procurement of Bore well materials amount Rs.33 lakhs will met from A S C Grants 2014-15
5   Hindupur Once In Two Days Once In Two Days 20 25 30 15 20 10 160 50 30 60 50 10 200 5 30 25 30 100 10000 250 550 0 0 550 0 Daily The RWS dept has to release 10 MLD of water from PABR Source and otherwise it is very difficult to meet the requirement of water from existing borewells as the yield from the borewells is decreased day to day.
6   Kadiri Once In Two Days Once In a Day 0 0 5 5 5 2 30 5 0 0 0 0 0 0 0 0 4320 6 60 4 22 0 0 22 0 Repairs to Power Borewells 10 Nos at a cost of Rs. 9.50 Lakhs Repairs to Motors and Pumpsets in Malakavemula Pump House 3 Nos at a cost of Rs. 3.50 Lakhs Repairs to Motors and Pumpsets in Dorigallu Pump House 3 Nos at a cost of Rs. 6.00 Lakhs Repairs to Motors and Pumpsets in Intakewell Pump House 3 Nos at a cost of Rs. 8.50 Lakhs Payable for Sri Satya Sai Water Supply Project Board Anantapurmu at a cost of 10.00 Lakhs.
7   Kalyandurgam Once In a Day Once In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11600 Submitted Detailed Project Report for water supply improvement with PABR as source for Rs. 116.00 Cr
8   Madakasira Once In a Day Once In a Day 10 11 30 12 5 1 5 1 0 0 0 0 0 0 5 1 3600 10 3000 15 51 0 12 39 0 0
9   Paamadi Once In Two Days Once In a Day 4 20 20 1 0 0 10 1 5 2 20 1 50 1 0 0 8 18 3950 46 90 14 1 75 5696
  • P.Kondapuram 1st& 2nd wards-By engaging additional 3 nos hired tankers to supply water daily by filling the 50 KL ELSR of RWS department JC Nagireddy scheme with YTC scheme for Rs.12.00 lakhs
  • In P.Kothapalli 19 th ward By engaging addition 2 nos hired tankers to supply water dialy with Municipal water for Rs.6.00 Lakhs
  • Teachers colony Nagireddy colony, Hanuman talkies road & Dattatreya swamy gudi area (6,7 & 8th wards)By replacing the delivery mains from ELSRs to above areas from 80 mm dia to 160 mm dia and extension of distribution pipe lines in extended areas of the town for rs. 46.00 lakhs for a length of 3.91 kms.
  • By drilling of additional filter points in Penna river bed for 20.00 lakhs.
  • By purchasing the valves and specials(80 mm dia to 200 mm dia) 3.00 lakhs.
  • Release of ASC grants for the year 2015-16 for Rs.42.52 lakhs
  • 10   Puttaparthy Once In a Day Once In a Day 5 9 15 5 5 1 5 1 10 5 10 1 10 1 5 9 1800 5 2200 7 44 0 0 44 3967 0
    11   Rayadurg Once In Two Days Once In a Day 20 20 30 15 0 0 20 10 20 20 60 5 300 5 0 0 7500 12 2000 70 157 0 5 152 0 CID joints 100mm dia to 300 dia valves 100mm dia to 300 dia New pump sets 1.5 to 7.5 HP Hiring of tankers 10 numbers
    12   Tadipatri Once In Two Days Once In a Day 24 15 18 5 0 0 0 0 10 10 12 6 100 2 0 0 0 0 1000 10 48 0 0 48 17400 1) The source of drinking water is in subsurface in Penna River basin through filter points 2) Present the water is being supplied 70 LPCD 3) DRPS submitted for comprehensive water supply scheme to Tadiaptri Municipality as OWK as source 4) For improving source Flushing and deepening of existing bores and drilling of new filter points in Penna River basin with relevant meaterials. 5) The water level depth in Penna basin 44 feet and upto 52 feet (only 8 of water is available)
    Chittoor 13   Chittoor M.Corp Once In a Day Once In a Day 16 74 50 25 5 3 16 20 5 4 20 10 0 0 10 46 36500 101 35000 1025 1308 120 731 457 700 -
    14   Madanapalle Once In Two Days Once In Two Days 20 40 25 20 0 0 100 20 45 50 57 15 300 5 0 0 600 405 10000 60 615 0 0 615 0 0
    15   Nagari Once In a Day Once In a Day 20 7 40 2 5 1 20 8 50 17 20 5 20 0 2 1 2100 8 2500 15 64 10 24 30 0 Action plan for 65lakh
    16   Palamaneru Once In a Day Once In Two Days 20 80 10 7 10 10 0 0 0 0 0 0 0 0 20 186 12600 61 7750 38 382 0 0 382 0 The Palamaner Municipality has submitted the summer action plan to improve the water. Hence Rs.186 lakhs is required to mitigate the water scarcity in ULB and requested for favorable action
    17   Punganur Once In a Day Once In a Day 20 100 15 30 2 10 15 15 20 15 15 5 100 5 2 8 210 141 4000 55 384 0 0 384 0 0
    18   Puttur Once In a Day Once In a Day 6 3 4 1 0 0 0 2 10 10 10 3 50 2 0 0 0 0 2 20 41 0 27 14 0 0
    19   Srikalahasti Once In a Day Once In a Day 0 0 0 0 0 0 20 8 30 10 0 0 0 0 0 0 0 0 70 2 20 20 0 0 0 Hand Bore Materials Pipe Lines Inter Connections and Pump Sets
    20   Tirupati M.Corp Once In a Day Twice In a Day 0 0 50 33 0 0 8 15 8 335 60 80 125 11 0 0 30 76 14300 250 800 800 120 -120 650
  • DPR under preparation for Rs.650.00 crores with Sai ganga canal as source
  • East Godavari 21   Amalapuram Twice In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    22   Gollaprolu Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    23   Kakinada M.Corp Twice In a Day Twice In a Day 126 5 8 1 0 0 160 7 0 0 8 5 120 9 0 0 2160 19 0 0 46 65 5 -24 0
  • Water supply Twice in a day total 3 12 hours supply given in 1 to 50 Divisions and 1 merged village .
  • once in a day through tankers to Swamy nagar and S.Atchutaapuram merged villages.
  • 24   Mandapeta Twice In a Day Twice In a Day 10 2 0 0 0 0 90 2 4 4 0 0 0 0 0 0 0 0 535 8 16 0 5 11 0 0
    25   Mumidivaram Twice In a Day Twice In a Day 0 0 0 0 0 0 2 1 3 2 0 0 0 0 0 0 600 5 500 5 13 5 6 2 0 0
    26   Peddapuram Twice In a Day Twice In a Day 2 8 0 0 0 0 3 2 0 0 0 0 0 0 0 0 1212 6 300 3 19 0 0 19 8600 awaiting for grant sanction from state government as well as central government
    27   Pithapuram Twice In a Day Twice In a Day 0 0 6 2 0 0 0 0 1 1 3 0 0 0 0 0 675 2 0 0 5 0 2 3 40 Pipe line repairs Rs. 1.00 Lakhs Purchasing of new water tanker 4000 Lts capacity Rs.3.30 Lakhs
    28   Rajahmundry M.Corp Twice In a Day Twice In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 10 0 0 10 0 0 10 50612 0
    29   Ramachandrapuram Twice In a Day Twice In a Day 0 0 4 2 0 0 5 2 2 1 0 0 0 0 0 0 5 1 0 0 6 0 3 3 670 0
    30   Samalkota Twice In a Day Twice In a Day 1 10 0 0 0 0 4 4 7 13 1 2 0 0 0 0 2 5 6 6 40 0 0 40 8660 DPR Submitted
    31   Tuni Twice In a Day Twice In a Day 0 0 15 1 0 0 15 1 0 0 0 0 0 0 0 0 0 0 0 0 2 0 3 -1 0
  • ward nos. 1 to 30 Twice in a day through distribution network.
  • One Own Water Tanker 6 tripsdaySupplied water to 1st ward 2 Trips2nd Ward 2Trips15th ward 1 trip17 th ward 1 trip and also where ever necessary water pressure arises.
  • 32   Yeleswaram Twice In a Day Data Not Entered 1 2 8 2 0 0 3 5 3 3 0 0 1 1 1 2 0 0 35 6 21 6 5 10 37 0
    Guntur 33   Bapatla Once In a Day Twice In a Day 0 0 0 0 0 0 0 0 0 0 5 2 50 2 4 5 3 2 700 11 22 2 9 11 73 DPR Prepared for New SS Tank and Pipe line.
    34   Chilakaluripet Once In a Day Once In a Day 0 0 0 0 0 0 0 0 0 0 24 6 150 2 0 0 5 14 12750 289 311 0 24 287 14200 Water Supply DPR prepared and submitted to higher authorities.
    35   Guntur M.Corp Once In a Day Once In a Day 0 0 0 0 0 0 6 29 5 43 6 69 0 0 13 128 55722 141 11673 354 764 764 0 0 0 DPR preparation is under progress for Water Supply and Infrastructure in 10 merged villages in Guntur Municipal Corporation
    36   Macherla Once In Two Days Once In a Day 10 25 0 0 0 0 0 5 2 2 0 0 0 0 0 0 2 36 300 24 92 0 2 90 65
  • Proposed Improvement in Frequency of Supply every day
  • Bore Well Materials / Others 5 Lakhs
  • New Pump Sets / Motors 2nos, 2 Lakhs
  • Hiring of additional Tankers and Increasing of Tanker Trips 2nos, 3.60 Lakhs
  • Extension of Pipe Lines 300mtrs, 24 Lakhs
  • ASC Grants Pending at ULB if any 2 Lakhs
  • Long Term Measures (DPRs,etc) 65cr
  • 37   Mangalagiri Once In a Day Once In a Day 0 0 0 0 0 0 30 3 0 0 0 0 0 0 0 0 9 0 11000 194 197 0 0 197 0 DPR is prepared for Rs.82.00 Crores for additional requirement of filtration plant ELSRs and distribution pipe lines.
    38   Narasaraopeta Once In a Day Twice In a Day 0 0 0 0 0 0 36 350000 0 0 0 0 0 0 0 0 4800 631000 0 0 981000 0 631000 350000 0 Tender to be called for preparation of DPR
    39   Piduguralla Twice In a Day Twice In a Day 6 12 0 0 0 0 50 9 8 4 0 0 0 0 0 0 30 10 835 8 43 0 0 43 0 Summer action plan is submitted for Rs 43.00 Lakhs for 3 Tankers 6 new Power Bore Wells 8 numbers of motors and pump sets and Extension of pipelines
    40   Ponnur Once In a Day Once In a Day 0 0 0 0 0 0 268 8 0 0 0 0 0 0 0 0 0 0 1500 12 20 0 0 20 0 0
    41   Repalle Once In a Day Once In a Day 60 5 50 2 8 12 200 2 6 5 0 0 0 0 3 6 50 5 3 24 61 12 3 46 8800 8 Hand bores are proposed.and fixing oil engine through transportation of water tanks
    42   Sattenapalle Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sattenapalle Municipality Supplying water Daily once in 30 wards through piped network...Hence No summer action plan is required to supply water daily.
    43   Tadepalli Twice In a Day Twice In a Day 10 10 8 4 0 0 4 1 0 0 10 2 0 0 1 10 2000 10 1600 20 57 40 9 8 62 0
    44   Tenali Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    45   Vinukonda Once In a Day Once In a Day 15 10 0 0 0 0 1 2 2 4 5 2 40 2 1 400 12500 25 7000 65 510 0 0 510 150440 DPR prepared. Daily water supply will be given after completion of the new comprehensive water supply scheme
    Kadapa 46   Badvel Once In a Day Once In a Day 6 3 3 1 4 1 22 5 18 8 25 3 200 3 0 0 10080 35 1500 15 74 30 7 37 0 The action plan is for giving daily supply to the balance 10 wards where in 8 wards in alt days supply and 2 wards in once in three days.
    47   Jammalamadugu Once In a Day Once In a Day 4 4 0 0 0 0 0 0 6 6 0 0 0 0 0 0 4000 10 1900 19 39 0 0 39 0 Action plan is for interconnecting gaps in distn and transmission system new bores and standbye motors transportation
    48   Kadapa M.Corp Once In Two Days Once In a Day 41 65 20 9 8 12 80 30 25 18 23 48 200 2 0 0 8 20 6800 35 239 0 0 239 31800 The Government has accorded permission to utilize the 13th Finance Funds on priority basis for drinking water vide Go.Rt.No.143 MA and UD (UBS) department dated.03.03.2015. Accordingly the proposals were submitted to the E.N.C Public Health Hyderabad in the prescribed proforma for Rs.251.50 Lakhs.
    49   Mydukur Once In a Day Once In a Day 10 4 0 0 0 0 0 0 10 6 0 0 0 0 5 10 5000 15 2200 15 50 0 0 50 84 Action plan proposals are for interconnecting gaps in distn system new bores in place of dried up bores and transportation.
    50   Proddatur Once In Three Days Once In a Day 14 20 0 0 0 0 0 10 16 10 35 15 30 10 2 8 7 16 1000 16 105 35 60 10 13850 1) 0.3 TMC of water will be released from Mylavaram dam 2)After charging the river bed and after completion of proposed works under summer action plan.3)Action will be taken for changing of frequency of water supply from once in two days to once in aday
    51   Pulivendula Once In Two Days Once In Two Days 5 5 3 5 2 7 10 5 9 9 50 10 300 3 0 0 9000 31 6500 65 140 0 0 140 0 By drilling of bore wells at JNTU area and connecting main to existing line Fixing of new pumpset at Venkatapuram borewell and connecting to existing main Pumping main from hired borewells at JNTU area to existing pipe line by providing required capacity valves Drilling of new borewells at Namalagundu and fixing of required pumpsets Providing pumping main from New bore wells at Namalagundu to hillock Providing gravity main from hillock to Venkatapuram pumping station.
    52   Rajampet Once In a Day Once In a Day 6 4 5 4 0 0 6 2 11 11 25 4 150 7 0 0 0 0 7 70 102 0 0 102 0 Action plan proposals are for extension of net work to uncovered areas streamlining of zonal distribution system repairs to existing borewells and pipelines
    53   Rayachoti Once In a Day Once In a Day 15 6 5 2 0 0 15 1 5 2 20 3 100 3 0 0 1080 4 1500 15 36 0 39 -3 50 -
    54   Yerraguntla Once In a Day Twice In a Day 17 15 0 0 0 0 0 0 24 44 50 7 150 3 1 57 5760 22 5545 67 215 0 22 193 5250 Above proposals can bring the frequency to daily supply in all 20 wards
    Krishna 55   Gudivada Once In a Day Once In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
    56   Jaggayyapet Once In a Day Once In a Day 16 8 30 2 0 0 30 3 0 0 0 0 0 0 1 5 22 5 2000 20 43 2 42 -1 73 During April, May & June the water table is likely. To deplete to maintain water table at filtration well in Paleru River. Cross Bund to be provided in Paleru River with sand bags, for this an Estimate is prepared for Rs. 5.00 Lakshs
    57   Machilipatnam Once In Two Days Data Not Entered 0 0 0 0 0 0 0 0 3 4 7 2 120 2 0 0 18000 39 500 5 52 0 0 52 20000 -
    58   Nandigama Once In Two Days Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    59   Nuzivid Once In Two Days Once In a Day 0 0 50 5 0 0 303 5 0 0 25 3 250 1 0 0 2700 7 2500 25 46 0 0 46 0 Krishna water supply scheme will be commenced by April 2015 from that day daily water supply will be given.
    60   Pedana Once In Two Days Once In a Day 0 0 0 0 0 0 0 0 1 5 4 3 10 1 0 0 30 7 0 0 16 2 13 1 515 -
    61   Tiruvuru Once In Two Days Once In a Day 9 4 25 7 0 0 100 6 8 10 20 4 100 2 1 2 1500 5 1000 10 50 10 0 40 30 for improvement of frequency from once in two days to once in one day new another pumping main of 300 mm dia pipe line proposed for 1000 mt and estimated cost of rs 20.00 lakhs and 10.00lakhs for prepare DPR for change of internal existing distribution lines because of most of existing lines having with 80 mm dia and under 80 mm dia with AC fo C I and PVC lines.
    62   Vijayawada M.Corp Twice In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    63   Vuyyuru Twice In a Day Twice In a Day 2 8 20 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500 5 16 0 8 8 565 -
    Kurnool 64   Adoni Once In a Day Once In Two Days 20 40 0 0 0 0 20 30 20 20 60 20 500 4 0 0 0 0 8000 288 402 0 10 392 0 The Storage capacity of SS Tank is 3110 ML which is sufficient for 120 days if water supplied alternate days even after leakage Long Term Measures Nice Consultancy is on the Job of preparation of DPR for additional water supply improvement to Adoni Municipality
    65   Allagadda Once In a Day Twice In a Day 5 4 6 2 0 0 40 1 6 5 10 1 100 1 2 2 62 1 900 6 23 0 0 23 5 0
    66   Atmakur(kurnool) Once In Two Days Once In a Day 3 3 29 25 8 4 0 0 5 12 25 2 25 5 0 0 0 0 8505 30 81 0 12 69 9130 With the above proposals water drawel can be increased from 2.64 ML to 3.84 ML. and 85 percentage of the town can be served on daily basis ward no.1to20 except few tail end areas.
    67   Dhone Once In a Day Once In Two Days 5 3 13 3 0 0 50 3 7 5 40 3 300 2 0 0 2500 5 15000 60 84 150 40 -106 20 source improvement replacement of pumpsets improvement of disribution net work then only meet the normalacy of water supply
    68   Gudur(kurnool) Once In a Day Once In a Day 8 10 41 10 4 2 1 5 3 5 10 1 100 1 4 2 1400 7 500 10 53 0 0 53 414 Share from RWS Department has to be increased in order to supply water daily to all wards at 70 LPCD
    69   Kurnool M.Corp Once In a Day Once In a Day 16 10 87 5 0 0 300 7 2 24 60 15 1400 13 0 0 2548 10 3800 50 134 0 0 134 65979 To improve the sources Rs. 659.79 crores is required under APMDP Scheme. Seperate General Fund is not allocated for water supply action plan. But for operation maintenance of water supply including HTCC charges Rs. 800.00 Lakhs was allocated in Budget 2015.
    70   Nandikotkur Once In Two Days Twice In a Day 4 2 5 1 2 2 2 2 7 4 10 3 35 0 2 0 2880 10 1455 22 46 12 15 19 998 AFTER COMPLETION OF ABOVE WORKS WATER CAN BE SUPPLIED WITH A FREEQUENCY OF ONE IN A DAY
    71   Nandyal Once In a Day Once In a Day 16 10 25 5 0 0 462 15 4 15 0 0 0 0 0 8 1440 10 2600 50 113 0 0 113 18628 During closure of K.C. Canal the Nandyal Municipality has draw water from Velugodu Balancing Reservoir by providing cross bunds where ever necessary. Hence provision is made providing cross bund at TGP and K.C. Canal (Rs.8.00 Lakhs).
    72   Yemmiganur Once In a Day Twice In a Day 7 7 34 3 5 1 180 5 2 1 15 3 100 2 2 2 864 2 1200 14 40 40 0 0 0 Long term measures DPR proposed 109.34 crores. In summer LLC Closed, for action plan improving for amount required 40.00 Lakhs.
    Nellore 73   Atamakur(nellore) Once In a Day Once In a Day 5 4 30 3 0 0 0 5 8 8 0 4 0 1 0 0 0 15 0 0 40 0 40 0 0 The Atmakur Municipality Area is situated in hilly place, the almost ground water level is decreased in depth of 200 feets fall down and 80% handbores are deepening in summer time. Due to non availability of water source, and the Municipality is having 10 power bores. one power bore at Penna and remaining are scattered in habitations. 3 bores are dried and 3 pump sets are not in good condition. In this circumstances above mentioned action plan requirement of grant is necessary for Summer situation in Atmakur Municipality.
    74   Gudur(nellore) Twice In a Day Once In a Day 0 0 0 0 0 0 0 0 8 10 1 0 50 1 0 0 0 0 30 0 11 125 0 -114 0 0
    75   Kavali Once In a Day Once In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    76   Naidupeta Twice In a Day Twice In a Day 4 2 10 1 0 0 5 1 4 2 0 0 0 0 0 0 0 0 1100 6 12 12 3 -3 0 0
    77   Nellore M.Corp Twice In a Day Twice In a Day 1 1 1 1 0 0 51 29 42 18 0 0 0 0 0 0 15714 55 17100 171 275 0 0 275 88900 Comprehensive water supply improvement scheme in NMC . Est.amount = 899.10 crores
    78   Sullurupet Once In a Day Twice In a Day 2 2 0 0 0 0 15 1 10 4 20 3 35 2 1 5 1000 4 2000 2 23 0 0 23 15800 0
    79   Venkatagiri Once In a Day Once In a Day 4 2 50 2 0 0 150 5 2 2 10 1 125 1 0 0 0 0 750 6 19 0 5 14 0 0
    Prakasam 80   Addanki Once In Two Days Once In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8990 1). Present Water Supply 63 LPCD. 2) Frequency Daily. 3) Source Gundlakamma River. 4). The Govt. has released Rs.10.00 Lakhs under ASC grants and proposed for utilisation of Transportation of Drinking Water Repairs to Borewell Flushing of Bore Wells and procurement of pumpsets
    81   Chimakurthy Once In Two Days Once In Two Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6600 20 0 0 20 0 0 20 6700
  • At present 70 ML is available in SS Tank out of 400ML capacity and available water will be sufficient for 19 days.
  • The Govt. has released Rs.13.00 Lakhs under ASC grants and the same was utilised. And Additional Proposals to be submitted for Rs. 20.00 Lakhs under contigent action plan from 21-9-2015 to 19-11-2015
  • 82   Chirala Once In a Day Once In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1). Present Water Supply 78 LPCD. 2) Frequency Daily. 3) Source Kommamur Canal. 4). Filling of S.S Tank is in progress.5) ASC Grants releases Nil.
    83   Giddaluru Once In Three Days Once In Three Days 5 5 0 0 5 1 1 5 0 0 0 0 0 0 0 0 6000 14 5000 25 50 0 0 50 0 due to no rain,the Water Table is getting depleted day to day and 56 Nos. of Bores are dried up out of 118 existing Bores. Henceit is proposed to Drill New Bores at K.S Palli and Interconnecting the existing Pipelines Purchase of Diesel Generators and Transportation of water etc. under Contingent Summer Action Plan for Rs.50.00 lakhs from 01092015 to 30112015.
    84   Kandukur Once In a Day Once In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1). Present Water Supply 108 LPCD. 2) Frequency Daily. 3) Source Ramatheertham Balance Reservoir. 4). The water available in SS Tank presently will be sufficient for 100 Days.
    85   Kanigiri Once In a Day Once In Two Days 0 0 0 0 8 2 0 0 0 0 0 0 0 0 0 0 2400 6 0 0 8 0 0 8 17600 The Govt. has released Rs.65.00 Lakhs under ASC grants and the same was utilised. And Additional Proposals to be submitted for Rs. 27.00 Lakhs under contigent action plan from 1/09/2015 to 30/10/2015.
    86   Markapur Once In Four Days Once In Two Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7200 17 4000 20 37 0 0 37 1000 1). Present Water Supply 100 LPCD. 2) Frequency Once in Two Days. 3) Source Nagarjuna Sagar Right Canal. 4)Present water in S.S Tank 230ML. 5) Proposals for Rs. 57.00 Lakhs is required under ASC Grant to mitigate the drinking water problem for next three months for Transportation Repairs of Bore etc. 6)DPR for total town distribution network to an amount of Rs.10.00Crores was submitted to PD APMDP for sanction.
    87   Ongole M.Corp Once In Two Days Twice In a Day 20 10 40 4 0 0 160 16 4 25 25 10 0 0 0 0 29000 65 1700 85 215 0 0 215 39300 At present water is supplying once in Three Days due to poor storage of water in the SS Tanks. After release of water through Nagarjuna Sagar Canals SS Tanks will be filled up. And there after water will be supplied once in a day. The Govt. has released Nil and now Rs.215.00 lakhs are proposed under contingent action plan.
    Srikakulam 88   Amadalavalasa Once In a Day Once In a Day 10 10 20 2 0 0 35 5 3 9 15 10 1000 5 0 0 1440 6 3000 100 147 0 0 147 0
  • water supply DPR Price bid submitted for approval
  • 89   Ichapuram Once In a Day Once In a Day 0 0 10 1 0 0 30 4 0 0 7 1 60 0 0 0 4800 6 0 0 12 0 0 12 0
  • Re tenders to be called for D.P.R
  • 2013.14 ASC grants to be adjusted
  • General funds are not available to meet the Summer action plan.
  • Up to 2.00 lakhs can be adjusted from the General funds.
  • 90   Palakonda Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    91   Palasa Kasibugga Once In a Day Once In a Day 15 30 191 10 0 0 0 6 0 0 0 0 0 0 0 0 8 36 0 0 82 0 0 82 0 0
    92   Rajam Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    93   Srikakulam Twice In a Day Twice In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    Visakhapatnam 94   Greater Visakhapatnam M.Corp Once In a Day Once In a Day 180 125 0 0 0 0 0 85 0 83 0 78 0 0 1 56 0 151 0 327 905 0 0 905 0 -
    95   Narsipatnam Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    96   Yelamanchili Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    Vizianagaram 97   Bobbili Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    98   Nellimarla Nagar Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    99   Parvathipuram Once In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    100   Salur Once In a Day Once In a Day 0 0 30 2 0 0 200 2 0 0 4 2 50 1 1 1 350 3 1000 15 26 4 0 22 5405 0
    101   Vizianagaram Once In Two Days Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
    West Godavari 102   Bheemavaram Twice In a Day Twice In a Day 0 0 0 0 86 4 0 0 2 10 0 0 0 0 0 0 5680 17 0 0 31 67 0 -36 1650 0
    103   Eluru M.Corp Twice In a Day Twice In a Day 0 0 0 0 0 0 300 15 0 0 0 0 0 0 1 5 6000 18 500 12 50 0 0 50 0 0
    104   Jangareddygudem Twice In a Day Twice In a Day 12 4 31 8 0 0 0 0 12 8 10 2 50 2 0 0 3 12 3500 40 76 50 2 24 58
  • Frequency of Water Supply Twice in a Day Action Plan to be submitted.
  • DPR submitted for Rs.58.48 crores source from Yerrakaluva. Base year 2017
  • 105   Kovvur Twice In a Day Twice In a Day 22 4 0 0 0 0 1 1 0 0 0 0 0 0 0 0 700 3 0 0 8 0 0 8 4500 1) Water Supply materials for Arresting of Distribution Pipe Line Leaks cost of Rs. 0.70 Lakhs 2) Replacement and Repairs to Motors and Pumpsets cost of Rs. 1.00 Lakh.
    106   Narsapur Twice In a Day Twice In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 10 25 10 450 6 26 0 0 26 14454 Summer action plan sent 27.50 lakhs the above said items
    107   Nidadavole Twice In a Day Twice In a Day 4 16 0 0 0 0 0 8 5 5 0 0 0 0 0 0 5 4 210 3 36 9 0 27 5900 Comprehensive Water Supply DPR submitted to the Govt.,
    108   Palacole Twice In a Day Twice In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16700 -
    109   Tadepalligudem Twice In a Day Twice In a Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4400 11 0 0 11 11 0 0 119
  • Present Water supply is 115 lpcd
  • Source is Surface
  • Status of Source Sufficient
  • Lack of Infrastructure Distribution lines
  • Status of future proposals ongoing/Proposed schemes DPR Submitted to ENC Office with project cost of Rs.119.25 Crores
  • Adverse water supply issues Transportation required an amount of Rs.9.41 Lakhs
  • Status of Ground water table 13.75m
  • SS tank filled upto MWL 4.73m. Twice in a day
  • All 35 wards through piped network and Parts of 7,11,13&33rd wards through tankers and also in 1,16,18,19,25,28,32 &35th wards water is being supplied through tankers due to insufficient pressure at tail ends of distribution network.
  • 110   Tanuku Twice In a Day Data Not Entered 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -